Bathroom Remodel

Published on 12 April 2025 at 16:53

Bathroom Remodel 1


This remodel included a full gut of the floor, walls, and ceiling. The project required leveling the floors and reinforcement of the existing structural frame. True historic Subway tile with a crackle glaze was used. All mechanicals were upgraded to modern standards. Custom carpentry included custom medicine cabinet and radiator cover, as well as historically matched window casings and sill replacement.